Gallwch symud o gwmpas gyda'ch bysellfwrdd
plws
minws
chwith
cywir
Gollwng pin ar y map i ddechrau adroddiad newydd
gofod
Gwasgwch 'Bylchu' eto er mwyn newid y lleoliad
gofod
Start new report here Reposition report here
Yn ôl at bob adroddiad

Road surface and subbase failing

Adroddwyd drwy mobile yn y categori Ffyrdd/priffyrdd yn ddienw am 08:53, Dydd Llun 2 Mawrth 2026

Anfon at Cyngor Caerdydd llai na munud yn hwyrach. Cyfeirnod FixMyStreet: 9025531.

The road surface is breaking up along an extensive area at least 5-10m long. The surface issues appear to be related to a deeper failure of the road structure as this same area was extensively patched a couple of years ago but is already in a worse condition than it was before the repair.

In wet conditions the passage of heavy vehicles causes mud from the subgrade to be pumped out to the surface, risking clogging drains. In dry conditions the area is incredibly dusty, leaving cars and gardens and house windows dirty.

Diweddariadau

  • Some attempt has been made to apply a temporary patch, which has alleviated the issue in the short term but will last days rather than months. The surface immediately adjacent to the patch is already developing into a new pothole. A proper fix is still needed.

    Postiwyd yn ddienw am 10:27, Dydd Llun 30 Mawrth 2026

Darparu diweddariad

Noder na chaiff diweddariadau eu hanfon at y cyngor. Bydd eich gwybodaeth ond yn cael ei defnyddio yn unol â’n polisi preifatrwydd

Nesaf: Dwedwch wrthym ni amdanoch chi

Eich diweddariad

Dwedwch wrthym ni amdanoch chi

Oes gennych chi gyfrinair FixMyStreet?