Failure to comply with standards on re-surfacing

Adroddwyd drwy desktop yn y categori Ffyrdd/priffyrdd gan MR MARK G ROSENTHAL am 07:28, Dydd Llun 9 Chwefror 2026

Anfon at Cyngor Sir Ynys Môn llai na munud yn hwyrach. Cyfeirnod FixMyStreet: 8870920.

Failure of Highways to provide information on the criteria and specification No observation and checking by a council rep of the works as set out by the contractor. Following the milling it was clear that the subsoil was saturated sand and should have been excavated to the recommenced depth for a layer of MOT Type 1 laid over a geotextile membrane then compacted prior to the basecourse tarmac being laid. This was not carried out. It would appear that no checks were made on tarmacadam temperature during the course of the day. As a result there are areas where the later additions have not bonded. The planned laying of concrete channels did not happen, as recommended prior to the laying of the base course. As a result the edge of the basecourse is not compacted to a suitable standard.

Diweddariadau

  • There has been no satisfactory response, merely obfuscation. Damage to a water meter installation is being dealt with through Dwr Cymru..

    Postiwyd gan MR MARK G ROSENTHAL am 07:41, Dydd Llun 9 Mawrth 2026
    Yn parhau i fod ar agor, trwy holiadur

Darparu diweddariad

Noder na chaiff diweddariadau eu hanfon at y cyngor. Bydd eich gwybodaeth ond yn cael ei defnyddio yn unol â’n polisi preifatrwydd

Nesaf: Dwedwch wrthym ni amdanoch chi

Eich diweddariad

Dwedwch wrthym ni amdanoch chi