Investigating
Blocked gully and drainage system
Adroddwyd drwy desktop yn y categori Roads and Carriageways yn ddienw am 09:49, Iau 4 Rhagfyr 2025
Anfon at Oxfordshire County Council 7 munud yn hwyrach. Cyfeirnod FixMyStreet: 8500081.
This issue is ongoing for well over 12 months plus. And no action appears to be taken against this site. Due to mud and debris being taken onto the highway by trucks leaving from the adjacent landfill site the large build up is continuing to block the gully’s etc along this road. Surly due to the large number of vehicle movements that as per HSE Guidance the operators should be arranging so that roadgoing vehicles do not drive onto mud on the site. This is prevented by laying roads and using site base plant to move materials to holding areas at the edge of the site. If vehicles are likely to pick up mode which they do the site should anticipate this and install a wheel wash routine or as a back up. The site should have arrangements in place to call-in Road sweeping machine at short notice, but due to the amount of debris this is not effective site management should also be monitoring conditions outside their site regularly during periods of material movement. Due to the extensive rain that we’ve had over the last six months, the debris being brought onto the highway / foot paths is getting worse, causing the local authority more work and cost. Surely it is about time that the operator is made to provide this wash facility and no vehicles should leave until they have used it and are clean.
Cyfeirnod y cyngor: ENQ251066924
Diweddariadau
Darparu diweddariad
Bydd eich gwybodaeth ond yn cael ei defnyddio yn unol â’n polisi preifatrwydd