Public footpath blocked

Adroddwyd drwy mobile yn y categori Public Right of Way footpath yn ddienw am 09:20, Iau 9 Hydref 2025 using FixMyStreet Pro

Anfon at Bromley Council llai na munud yn hwyrach. Cyfeirnod FixMyStreet: 8272619.

CPFC and its contractors have blocked the public footpath on CCR without either any advance notice or without displaying and notice of permission granted and timing of when the path will be closed. I therefore assume that no permission has been obtained from the council and enforcement action should be taken Further, they had applied tarmac to the step between the road and pavement to create a ramp of sorts but did not wait until this had set dry before opening the diversion. As a result, I used this with my dogs and their paws were covered in toxic tarmac. This is simply unacceptable

Diweddariadau

  • Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices

    Cyflwr wedi newid i: In progress

    Postiwyd gan Bromley Council am 09:21, Iau 9 Hydref 2025

  • Thank you for your report. This has been passed to enforcement to investigate. Thank you for bringing this to our attention.

    Cyflwr wedi newid i: Investigating

    Postiwyd gan Bromley Council am 17:52, Iau 9 Hydref 2025

  • We are continuing to investigate and working to resolve this report

    Cyflwr wedi newid i: In progress

    Postiwyd gan Bromley Council am 08:09, Gwen 10 Hydref 2025

  • The Council's Streetworks department have confirmed that these are authorised works, and will contact them to ensure their licence conditions are met.

    Postiwyd gan Bromley Council am 08:28, Gwen 10 Hydref 2025

  • Thank you for using FixMyStreet to report your concerns to Bromley.

    Cyflwr wedi newid i: Ar gau

    Postiwyd gan Bromley Council am 08:31, Gwen 10 Hydref 2025

  • Whilst I understand the necessary authorisations are in place this work is still going on and today, SUNDAY 2 November, work was taking place. This work should not be taking place disturbing neighbours on a Sunday. Noisy building works are permitted on a Sunday so I question why this was occurring? Further the footpath was closed with no appropriate signage in place or the required pedestrian diversion. A mini excavator was in the road blocking traffic from one direction with NO traffic signage or suitable warnings. This was extremely and avoidably dangerous for both cars and pedestrians, the latter, like myself were being forced to walk on the road. It was an accident waiting to happen. I enquired with the contractors and they just said they were acting for CPFC and it needed to be done today. When I questioned about pedestrian signage and diversion, he said he was going to do it later.

    Cyflwr wedi newid i: Agor

    Postiwyd yn ddienw am 18:33, Sul 2 Tachwedd 2025

  • Your report is being investigated further. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices

    Cyflwr wedi newid i: In progress

    Postiwyd gan Bromley Council am 11:25, Mer 5 Tachwedd 2025

  • Thank you for your report. These are private works and a safe footway has been provided for residents to use. Please use the safe footway provided.

    Cyflwr wedi newid i: third party responsibility

    Postiwyd gan Bromley Council am 13:34, Mer 5 Tachwedd 2025

  • Thank you for using FixMyStreet to report your concerns to Bromley.

    Cyflwr wedi newid i: Ar gau

    Postiwyd gan Bromley Council am 13:34, Mer 5 Tachwedd 2025

  • Safe footpath is NOT provided. How is a wheelchair user expected to navigate the street? No temporary crossing has been made available

    Cyflwr wedi newid i: Agor

    Postiwyd yn ddienw am 13:38, Mer 5 Tachwedd 2025

  • Note change to third party responsibility. We have called this out to the third party directly which should not be our responsibility but nothing has been done. What does the council intend to do to enforce the third party to fulfil its responsibilities?

    Postiwyd yn ddienw am 14:07, Mer 5 Tachwedd 2025

  • Thank you for your report. I will pass this to the enforcement team to see if there is anything they are able to assist with.

    Cyflwr wedi newid i: Investigating

    Postiwyd gan Bromley Council am 20:29, Maw 11 Tachwedd 2025

  • I am writing to communicate the latest position of the public footpath outside the CPFC academy as marked. See attached photos. The situation outside the academy contravenes multiples traffic management and H&S regs: - the closure of the footpath is not signed either at the stay of its closure or at reasonable distance leading up to it as is required - there is no signed diversion for pedestrians - there is no display of the necessary permissions obtained from the Council to close the footpath again (for the third time in less than a month) or indication of when these permissions have been obtained until - the whole footpath and grass verge has been closed which appears unnecessary but makes life easier for CPFC contractors - there are no access ramps for pedestrians from the grass verge to the road level at either ends of the diversion - A wheelchair or pushchair user of the footpath is currently unable to navigate this section of the street and is therefore currently being discriminated against.

    This is completely unacceptable and enforcement action is needed without delay.

    Postiwyd yn ddienw am 16:09, Mer 19 Tachwedd 2025

  • I am writing to communicate the latest position of the public footpath outside the CPFC academy as marked. See attached photos. The situation outside the academy contravenes multiples traffic management and H&S regs: - the closure of the footpath is not signed either at the stay of its closure or at reasonable distance leading up to it as is required - there is no signed diversion for pedestrians - there is no display of the necessary permissions obtained from the Council to close the footpath again (for the third time in less than a month) or indication of when these permissions have been obtained until - the whole footpath and grass verge has been closed which appears unnecessary but makes life easier for CPFC contractors - there are no access ramps for pedestrians from the grass verge to the road level at either ends of the diversion - A wheelchair or pushchair user of the footpath is currently unable to navigate this section of the street and is therefore currently being discriminated against.

    This is completely unacceptable and enforcement action is needed without delay.

    Postiwyd yn ddienw am 16:23, Mer 19 Tachwedd 2025

  • Thank you for your update. This information has been passed to the enforcement team to investigate further. Thank you for bringing this to our attention.

    Postiwyd gan Bromley Council am 15:20, Sul 30 Tachwedd 2025

  • Your report is being investigated further. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices

    Cyflwr wedi newid i: In progress

    Postiwyd gan Bromley Council am 15:21, Sul 30 Tachwedd 2025

  • We have notified the responsible party of their duties and responsibilities and informed them that further enforcement action may be taken if the issue is not resolved. For overhanging vegetation reports please allow 28 days for the responsible party to arrange action before notifying us of any continued obstruction.

    Cyflwr wedi newid i: Ar gau

    Postiwyd gan Bromley Council am 07:52, Llun 1 Rhagfyr 2025

  • Please state when S50 has been permitted until and amount of FPN levied

    Cyflwr wedi newid i: Agor

    Postiwyd yn ddienw am 08:17, Llun 1 Rhagfyr 2025

  • CPFC are still not displaying any footpath closure signage or diversion signage and their diversion is pitiful being onto a very dirty, leaf covered and unkempt section of the road making it impossible for wheelchair or pushchair users to navigate

    Postiwyd yn ddienw am 14:25, Maw 2 Rhagfyr 2025

  • Thank you for your update. This information has been passed to the enforcement team to investigate further. Thank you for bringing this to our attention.

    Cyflwr wedi newid i: Investigating

    Postiwyd gan Bromley Council am 17:09, Maw 9 Rhagfyr 2025

  • Your report is being investigated further. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices

    Cyflwr wedi newid i: In progress

    Postiwyd gan Bromley Council am 17:09, Maw 9 Rhagfyr 2025

  • See attached. The closed footpath and diversion are not lit. I walked along this part of the road on my way home from work this evening and, despite being aware from memory that the footpath closure was coming, I partially tripped over, just catching myself, as a result of the poor lighting and no signage whatsoever.

    As previously stated Palace are still not displaying any footpath closure signage or diversion signage and the diversion route is not adequately safe being onto a very uneven, leaf pile covered and unkempt section of the road making it impossible for wheelchair or pushchair users to navigate.

    Postiwyd yn ddienw am 18:32, Maw 9 Rhagfyr 2025

  • Our contractor has been notified to take the appropriate action.

    Postiwyd gan Bromley Council am 11:30, Mer 10 Rhagfyr 2025