Pavement and Kerb needs relaying
Adroddwyd drwy desktop yn y categori Pavement Defect yn ddienw am 14:31, Llun 11 Tachwedd 2024
Anfon at Bromley Council llai na munud yn hwyrach. Cyfeirnod FixMyStreet: 6719021.
Outside house number 12: Requesting urgent attention to the condition of the pavement and kerb in our area, which has deteriorated significantly due to tree root damage. Currently, the roots have lifted and cracked the pavement, creating large fissures throughout the tarmac. Additionally, the roots have breached the kerb and nearby road, with offshoots appearing causing further damage.
The situation poses a serious risk, particularly where the lowered kerb leading up to the driveway has shifted. This has resulted in uneven, cracked surfaces, creating a significant trip hazard for pedestrians. The uneven displacement between the tarmac and concrete is especially dangerous for young children and others walking along the pavement, as they are more vulnerable to tripping on these irregular surfaces.
In light of the safety risks, I urge the council to prioritise repairs to the pavement, kerb border, and driveway area. Additionally, implementing preventive measures to control the growth of tree roots will help prevent further damage to the surrounding infrastructure.
Thank you for your attention to this matter.
Diweddariadau
-
Thank you for your report, this is now being investigated. Information on our services and the timeframes we aim to respond in can be found: http://www.bromley.gov.uk/ fixservices
Cyflwr wedi newid i: In progress
Postiwyd gan Bromley Council
am 14:32, Llun 11 Tachwedd 2024
-
Our contractor has been notified to take the appropriate action.
Postiwyd gan Bromley Council
am 11:01, Maw 12 Tachwedd 2024
-
Further works are necessary to resolve the issue and have been scheduled for action.
Postiwyd gan Bromley Council
am 12:49, Mer 4 Rhagfyr 2024
-
Yn parhau i fod ar agor, trwy holiadur, 15:10, Llun 9 Rhagfyr 2024
-
Appropriate action has been taken to resolve the issue.
Cyflwr wedi newid i: Fixed
Postiwyd gan Bromley Council
am 11:08, Maw 10 Rhagfyr 2024
-
No action has been taken yet. Was this closed in error?
Postiwyd yn ddienw am 11:47, Maw 10 Rhagfyr 2024
-
Hi may I check this has been reopened as we have the spray paint on the pavement showing the section that needs to be relayed. However no work has been done.
Postiwyd yn ddienw am 11:00, Llun 23 Rhagfyr 2024
-
Yn parhau i fod ar agor, trwy holiadur, 16:13, Dydd Llun 6 Ionawr 2025
-
This has not been fixed, can you explain why this was closed?
Cyflwr wedi newid i: Agor
Postiwyd yn ddienw am 16:15, Dydd Llun 6 Ionawr 2025
-
We are continuing to investigate and working to resolve this report
Cyflwr wedi newid i: In progress
Postiwyd gan Bromley Council
am 16:38, Dydd Llun 6 Ionawr 2025
-
Our contractor has been notified to take the appropriate action.
Postiwyd gan Bromley Council
am 16:15, Dydd Iau 9 Ionawr 2025
-
Further works are necessary to resolve the issue and have been scheduled for action.
Postiwyd gan Bromley Council
am 11:42, Dydd Mawrth 4 Chwefror 2025
-
Further works are necessary to resolve the issue and have been scheduled for action.
Postiwyd gan Bromley Council
am 17:20, Dydd Mawrth 11 Chwefror 2025
-
For information, the order for this repair remains outstanding within our contractor's planned schedule of work. Further arrangements are currently being undertaken to provide traffic management and/or the necessary specialist equipment in order to undertake these works.
Postiwyd gan Bromley Council
am 12:41, Dydd Llun 17 Chwefror 2025
-
We are sorry that this work has not yet been completed. We are working with our minor works contractor in an effort to resolve this issue.
Postiwyd gan Bromley Council
am 14:39, Dydd Gwener 28 Mawrth 2025
-
Our contractor is aware that this work is outstanding. Thank you for your patience.
Postiwyd gan Bromley Council
am 12:38, Dydd Sul 6 Ebrill 2025
-
This work has been scheduled and will be carried out shortly. Thank you for your patience.
Postiwyd gan Bromley Council
am 15:19, Dydd Sul 27 Ebrill 2025
-
We are sorry that this work has not yet been completed. We are working with our minor works contractor in an effort to resolve this issue.
Postiwyd gan Bromley Council
am 13:42, Dydd Mercher 30 Ebrill 2025
-
We are sorry that this work has not yet been completed. We are working with our minor works contractor in an effort to resolve this issue.
Postiwyd gan Bromley Council
am 13:54, Dydd Iau 8 Mai 2025
-
Further works are necessary to resolve the issue and have been scheduled for action.
Postiwyd gan Bromley Council
am 16:01, Dydd Mercher 14 Mai 2025
-
Further works are necessary to resolve the issue and have been scheduled for action.
Postiwyd gan Bromley Council
am 15:09, Dydd Iau 5 Mehefin 2025
-
Appropriate action has been taken to resolve the issue.
Cyflwr wedi newid i: Fixed
Postiwyd gan Bromley Council
am 09:04, Dydd Llun 9 Mehefin 2025
-
Hi, thanks for the work that’s been done so far - it’s appreciated. However, the other half of the pathway still hasn’t been completed and it’s continuing to deteriorate. There’s a hole in the pavement that’s getting noticeably bigger and deeper, and other sections are breaking down too. It’s becoming a serious trip hazard, especially for people walking through the area.
Would it make more sense to resurface the whole pathway now, rather than keep patching things up bit by bit?
Also, just to flag the kerb is still exposed, and the yellow barriers haven’t been collected yet.
Thanks again, and hoping this can be looked into soon.
Cyflwr wedi newid i: Agor
Postiwyd yn ddienw am 11:08, Dydd Iau 11 Medi 2025
-
Hi
I see you have marked out the area to be fixed. Thanks for taking a look so quickly.
The surrounding area is also disintegrating. Would it be better to relay the entire area, rather than a small subsection, to avoid being called out again in 6 months time?
Postiwyd yn ddienw am 17:37, Dydd Mercher 1 Hydref 2025
-
Our contractor has been notified to take the appropriate action.
Cyflwr wedi newid i: In progress
Postiwyd gan Bromley Council
am 08:48, Dydd Iau 2 Hydref 2025
-
This repair remains outstanding with the Council's contractor and is on their programme of scheduled work, thank you for your patience in the meantime.
Postiwyd gan Bromley Council
am 09:34, Dydd Mercher 22 Hydref 2025
-
Appropriate action has been taken to resolve the issue.
Cyflwr wedi newid i: Fixed
Postiwyd gan Bromley Council
am 08:16, Dydd Gwener 28 Tachwedd 2025
Dim ond yr adroddwr gwreiddiol gall diweddaru. Os gwnaethoch chi'r adroddiad gwreiddiol , mewngofnodwch i ddiweddaru os gwelwch yn dda.