Gallwch symud o gwmpas gyda'ch bysellfwrdd
plws
minws
chwith
cywir
Gollwng pin ar y map i ddechrau adroddiad newydd
gofod
Gwasgwch 'Bylchu' eto er mwyn newid y lleoliad
gofod
Start new report here Reposition report here
Yn ôl at bob adroddiad

Flooding in place for over a month

Adroddwyd drwy mobile yn y categori Flooding on Road yn ddienw am 15:36, Iau 10 Hydref 2024

Anfon at Oxfordshire County Council 1 munud yn hwyrach. Cyfeirnod FixMyStreet: 6576315.

Dangerous flood water caused by the infill of the road verge, made worse by current Wain building works. Grit and other building materials all over the road. Absolutely needs rectifying and at a minimum scheduled road sweeping in place to avoid continued damage to vehicles.

Cyfeirnod y cyngor: ENQ241020236

Diweddariadau

  • Cyflwr wedi newid i: Investigating

    Diweddarwyd gan Oxfordshire County Council am 15:37, Iau 10 Hydref 2024

  • Road once again deeply flooded and impassable heading out of Faringdon. Accident waiting to happen and an important route connecting the town to the A420 and families to nearby nursery. The ditches on the A420 side of the road need clearing, they remain filled with water even during dry periods meaning even a small amount of rain causes floods.

    Postiwyd yn ddienw am 20:18, Sul 24 Tachwedd 2024

  • Thank you for bringing this matter to our attention. We are already aware of the issue and are actively investigating based on the initial report. For comprehensive information on our approach to highway repairs and risk assessment, please visit the Oxfordshire County Council’s website at https://www.oxfordshire.gov.uk/ residents/ roads-and-transport/ street-maintenance-z/ road-repairs .

    Cyflwr wedi newid i: Investigation complete

    Postiwyd gan Oxfordshire County Council am 13:20, Maw 6 Mai 2025

This report is now closed to updates from the public. Gallwch wneud adroddiad newydd am yr un lleoliad .