Gallwch symud o gwmpas gyda'ch bysellfwrdd
plws
minws
chwith
cywir
Gollwng pin ar y map i ddechrau adroddiad newydd
gofod
Gwasgwch 'Bylchu' eto er mwyn newid y lleoliad
gofod
Start new report here Reposition report here
Yn ôl at bob adroddiad

Several very deep potholes at passing place

Adroddwyd drwy mobile yn y categori Potholes & road surface yn ddienw am 07:57, Dydd Gwener 4 Hydref 2024

Anfon at Bath and North East Somerset Council llai na munud yn hwyrach. Cyfeirnod FixMyStreet: 6550046.

This whole section of Whitebrooks Lane has a bad surface, with water not running to the few drains due to rutting of the roadway by traffic.

However the only passing place is especially bad. The photos show severe damage to the road surface with the asphalt complete gone and the under-road subsurface now washing away rapidly. The potholes along the side of the road in the photos are very deep (4-6inches) and get bigger with every heavy rain fall. This is because the drains do not work

Walking down here when a car comes along risks a broken ankle if you step into one of these (sometimes they're full of leaves), or worse as broken glass has been pushed into one now.

The other side of the passing place is also bad with major cracking and chunks of road surface missing.

Both of these are bad enough to damage a vehicle, or to trip a pedestrian at night as it is badly lit.

Please can this section of road be checked and fixed as soon as possible. It is actively eroding away at the sides now. Many thanks

Ffrwd RSS o ddiweddariadau i'r broblem hon Derbyn e-bost pan fydd diweddariadau i'r broblem hon.

Diweddariadau

  • Thank you for your report. We will review the details you submitted and will inspect the site if necessary.

    We respond to 9 out of 10 reports of potholes and road surface issues within 10 working days, once we have decided on the best course of action. You can visit our website to find out what we do and why in some cases it can take longer than you might expect. https://beta.bathnes.gov.uk/ how-we-deal-problems-road-network

    You can support our investigation by providing as much detail as possible. If you can provide any extra information, please add an update to this report.

    Cyflwr wedi newid i: In progress

    Postiwyd gan Systems Team am 07:58, Dydd Gwener 4 Hydref 2024

  • Thank you for your report. We have investigated your issue and have passed the details onto our contractor. They will plan and complete any necessary work. We will update your report when the contractor has completed the work. We respond to 4 out of 5 reports within 30 working days, once we have decided on the best course of action.

    You can visit our website to find out what we do and why it can take longer than you might expect. https://beta.bathnes.gov.uk/ how-we-deal-problems-road-network

    Cyflwr wedi newid i: Action scheduled

    Postiwyd gan Systems Team am 15:39, Dydd Mawrth 8 Hydref 2024

  • Some paint marks around the worst bits appeared soon after, but have now washed away (presumably photos were taken).

    The deepest holes are now fully obscured by leaves so it's even more dangerous for pedestrians avoiding cars.

    Postiwyd yn ddienw am 08:35, Dydd Gwener 1 Tachwedd 2024
    Yn parhau i fod ar agor, trwy holiadur

  • We are pleased to say that our contractor has now completed their work. If this issue reoccurs, please log a new report. You can visit our website to find out more about what we do. Thank you for using Fix My Street, your online reporting helps us deal with problems more efficiently, while keeping you informed.https://beta.bathnes.gov.uk/ how-we-deal-problems-road-network

    Cyflwr wedi newid i: Fixed

    Postiwyd gan Systems Team am 14:29, Dydd Iau 7 Tachwedd 2024

  • Thank you, much better now!

    Postiwyd yn ddienw am 09:02, Dydd Gwener 29 Tachwedd 2024

This report is now closed to updates from the public. Gallwch wneud adroddiad newydd am yr un lleoliad .