Gallwch symud o gwmpas gyda'ch bysellfwrdd
plws
minws
chwith
cywir
Gollwng pin ar y map i ddechrau adroddiad newydd
gofod
Gwasgwch 'Bylchu' eto er mwyn newid y lleoliad
gofod
Start new report here Reposition report here
Yn ôl at bob adroddiad

Urgent water coming up from road

Adroddwyd drwy iOS yn y categori A pothole in road yn ddienw am 16:32, Sad 28 Medi 2024

Anfon at Gloucestershire County Council llai na munud yn hwyrach. Cyfeirnod FixMyStreet: 6526372.

Potholes and water coming up from road needs urgent attention as will be treacherous if turns to ice and is already slippery for all road users

Ffrwd RSS o ddiweddariadau i'r broblem hon Derbyn e-bost pan fydd diweddariadau i'r broblem hon.

Diweddariadau

  • Thank you for reporting a pothole.

    First, a safety inspector will visit the location to assess whether a repair needs to be completed and plan the work needed. Works are prioritised based on the urgency of the situation. The council aim to repair all significant potholes (more than 4cm deep and 30cm wide) within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    We will provide updates about this report.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads. Visit www.gloucestershire.gov.uk/highways/roads/potholes to find out more.

    Thank you again for taking the time to report this issue.

    Highways Customer Services Team,
    Gloucestershire Highways

    Postiwyd gan Gloucestershire County Council am 16:32, Sad 28 Medi 2024

  • This pothole report has now been passed to the Safety Inspection Team for assessment.

    A safety inspector will make an assessment of the work needed and they will consider a number of factors, including the flow of traffic and the size of the pothole.

    If repair work is required, the pothole will either be classed as urgent or will be put into a planned programme of works to ensure it is repaired as efficiently as possible. We aim to complete the repair work within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    An update on the outcome of the safety inspection will be provided.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    Cyflwr wedi newid i: Investigating

    Postiwyd gan Gloucestershire County Council am 13:17, Llun 30 Medi 2024

  • Cyflwr wedi newid i: Agor

    Diweddarwyd gan Gloucestershire County Council am 13:18, Llun 30 Medi 2024

  • This pothole report has now been passed to the Safety Inspection Team for assessment.

    A safety inspector will make an assessment of the work needed and they will consider a number of factors, including the flow of traffic and the size of the pothole.

    If repair work is required, the pothole will either be classed as urgent or will be put into a planned programme of works to ensure it is repaired as efficiently as possible. We aim to complete the repair work within 28 days.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    An update on the outcome of the safety inspection will be provided.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    Cyflwr wedi newid i: Investigating

    Postiwyd gan Gloucestershire County Council am 12:46, Mer 2 Hydref 2024

  • Work to repair this pothole has been planned. Work is usually completed within 28 days or sooner.

    In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.

    We will let you know when the work is complete.

    On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes

    Thank you,

    Highways Customer Services Team,
    Gloucestershire Highways

    Cyflwr wedi newid i: Action scheduled

    Postiwyd gan Gloucestershire County Council am 13:56, Iau 3 Hydref 2024

  • An engineer has attended the location and made the area safe.

    Further work is required and this will be scheduled. Please let us know if the situation deteriorates unexpectedly.

    Thank you,
    Highways Customer Services Team,
    Gloucestershire Highways

    Cyflwr wedi newid i: In progress

    Postiwyd gan Gloucestershire County Council am 12:42, Mer 30 Hydref 2024

This report is now closed to updates from the public. Gallwch wneud adroddiad newydd am yr un lleoliad .