Wedi trwsio
No a pot hole per se, but huge puddle of water collects when it rains
Adroddwyd drwy mobile yn y categori A pothole in road yn ddienw am 11:02, Dydd Sadwrn 7 Medi 2024 using FixMyStreet Pro
Anfon at Gloucestershire County Council llai na munud yn hwyrach. Cyfeirnod FixMyStreet: 6446188.
At traffic lighted pedestrian crossing. when it rains a huge puddle collects. cars turning left into Shelburne road unavoidably splash the pedestrians. pedestrians have to either jump over or walk through the puddle. road needs building up to stop the pooling of water.
Diweddariadau
-
Thank you for reporting a pothole.
First, a safety inspector will visit the location to assess whether a repair needs to be completed and plan the work needed. Works are prioritised based on the urgency of the situation. The council aim to repair all significant potholes (more than 4cm deep and 30cm wide) within 28 days.
In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.
We will provide updates about this report.
On our website you can read about five key actions we’re taking to strengthen the county’s roads. Visit www.gloucestershire.gov.uk/highways/roads/potholes to find out more.
Thank you again for taking the time to report this issue.
Highways Customer Services Team,
Gloucestershire Highways
Postiwyd gan Gloucestershire County Council am 11:02, Dydd Sadwrn 7 Medi 2024
-
This pothole report has now been passed to the Safety Inspection Team for assessment.
A safety inspector will make an assessment of the work needed and they will consider a number of factors, including the flow of traffic and the size of the pothole.
If repair work is required, the pothole will either be classed as urgent or will be put into a planned programme of works to ensure it is repaired as efficiently as possible. We aim to complete the repair work within 28 days.
In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.
An update on the outcome of the safety inspection will be provided.
On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes.
Thank you,
Highways Customer Services Team,
Gloucestershire HighwaysCyflwr wedi newid i: Investigating
Postiwyd gan Gloucestershire County Council am 12:59, Dydd Llun 9 Medi 2024
-
Work to repair this pothole has been planned. Work is usually completed within 28 days or sooner.
In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.
We will let you know when the work is complete.
On our website you can read about five key actions we’re taking to strengthen the county’s roads by visiting www.gloucestershire.gov.uk/highways/roads/potholes
Thank you,
Highways Customer Services Team,
Gloucestershire HighwaysCyflwr wedi newid i: Action scheduled
Postiwyd gan Gloucestershire County Council am 13:55, Dydd Llun 9 Medi 2024
-
I am pleased to inform you this pothole has been repaired.
Gloucestershire County Council is responsible for almost 6,000km of roads and each one is routinely inspected (on a monthly, quarterly or annual basis, depending on the type of road). Issues can develop quickly in between these inspections and residents help by reporting problems online.
Our longer term plans to improve road conditions include patching, resurfacing and maintenance works, information can be found online at www.gloucestershire.gov.uk/highways.
Thank you,
Highways Customer Services Team,
Gloucestershire HighwaysCyflwr wedi newid i: Fixed
Postiwyd gan Gloucestershire County Council am 12:07, Dydd Llun
This report is now closed to updates from the public. Gallwch wneud adroddiad newydd am yr un lleoliad .