Galsworthy Drive dangerous bend
Adroddwyd drwy iOS yn y categori Roads/highways yn ddienw am 20:05, Sul 4 Awst 2024
Anfon at Reading Borough Council llai na munud yn hwyrach. Cyfeirnod FixMyStreet: 6315132.
This has been reported numerous times over the years but there are two current issues that make this potential accident hotspot even more dangerous. The poor sight line on the inside of the sharp bend is now even trickier because of the very unkempt leylandi hedge bordering 25 Galsworthy Drive. The second issue concerns the incomplete double yellow lines on the outside of the bend. A short section from Jordan Close was painted but this could not apparently be completed because the work coincided with City Fibre excavations. This means that no lines were painted outside 38-40 Galsworthy even though this was part of the RBC approval. This was ages ago and no-one appears to have realised that the job has remained incomplete ever since.
Diweddariadau
-
The householder has now trimmed the hedge but it still too close to the kerb and the sight line is not much better. RBC have promised their contractor will paint the missing lines.
Postiwyd yn ddienw am 06:34, Sul 25 Awst 2024
-
Yn parhau i fod ar agor, trwy holiadur, 20:37, Sul 1 Medi 2024
-
2 months on and still no lines painted
Postiwyd yn ddienw am 07:23, Llun 30 Medi 2024
Yn parhau i fod ar agor, trwy holiadur -
Yn parhau i fod ar agor, trwy holiadur, 07:31, Llun 28 Hydref 2024
-
Yn parhau i fod ar agor, trwy holiadur, 08:24, Llun 25 Tachwedd 2024
-
Yn parhau i fod ar agor, trwy holiadur, 10:48, Llun 23 Rhagfyr 2024
-
Yn parhau i fod ar agor, trwy holiadur, 11:33, Dydd Llun
Darparu diweddariad
Noder na chaiff diweddariadau eu hanfon at y cyngor. Bydd eich gwybodaeth ond yn cael ei defnyddio yn unol â’n polisi preifatrwydd