Poor repair is leading to a new pothole developing.
Adroddwyd drwy desktop yn y categori A pothole in road yn ddienw am 17:07, Dydd Mercher 3 Ebrill 2024 using FixMyStreet Pro
Anfon at Gloucestershire County Council llai na munud yn hwyrach. Cyfeirnod FixMyStreet: 5802582.
This pothole was reported as closed on 28th March 2024 (last week). Previously reported under Enquiry Number: 22044788. From the two photos take on 1 and 3rd April it is obvious that the repair is totally inadequate as poor quality ashphalt has been used with no water seal present to existing surface. A large hole is developing in the repair. The contractor has not done their job effectively and should return and carry out a proper repair. Disappointing to see that following a week of work with traffic lights and barriers, leading to delays, the job is shown to be ineffective and poorly engineered. It should also be noted that all the gravel released from the deteriorating roadway is present in the gutters leading to potential damage to car windscreens and blocked drains. Is there not a system in place to audit /check contractor workmanship as this repair lasted two days! Poor value for money. A disappointed taxpayer.
Diweddariadau
-
Thank you for reporting a pothole.
First, a safety inspector will visit the location to assess whether a repair needs to be completed and plan the work needed. Works are prioritised based on the urgency of the situation. The council aim to repair all significant potholes (more than 4cm deep and 30cm wide) within 28 days.
In some cases a temporary repair will be needed, to make the area safe, then engineers will return to make a permanent repair.
We will provide updates about this report.
On our website you can read about five key actions we’re taking to strengthen the county’s roads. Visit www.gloucestershire.gov.uk/highways/roads/potholes to find out more.
Thank you again for taking the time to report this issue.
Highways Customer Services Team,
Gloucestershire Highways
Postiwyd gan Gloucestershire County Council am 17:07, Dydd Mercher 3 Ebrill 2024
This report is now closed to updates from the public. Gallwch wneud adroddiad newydd am yr un lleoliad .