Pothole on arboretum side of bridge
Adroddwyd drwy mobile yn y categori Potholes yn ddienw am 19:30, Dydd Gwener 19 Ionawr 2024
Anfon at Glasgow City Council llai na munud yn hwyrach. Cyfeirnod FixMyStreet: 5466101.
The bridge surface is poor where it joins the path at the arboretum, and has been for many months. There is now quite a large hole right across the join, between bridge and path. Can this be fixed/filled, please?
Diweddariadau
-
Yn parhau i fod ar agor, trwy holiadur, 19:16, Dydd Mercher 28 Chwefror 2024
-
Yn parhau i fod ar agor, trwy holiadur, 20:25, Dydd Mercher 27 Mawrth 2024
-
The path surface is now very degraded and a danger to cyclists. This is a well used path by walkers, wheelers, scooters, and cyclists on National Cycle Network 756.
Postiwyd yn ddienw am 13:38, Dydd Gwener 26 Ebrill 2024
Yn parhau i fod ar agor, trwy holiadur -
Yn parhau i fod ar agor, trwy holiadur, 08:06, Dydd Sul 26 Mai 2024
-
Yn parhau i fod ar agor, trwy holiadur, 21:35, Dydd Sadwrn 13 Gorffennaf 2024
-
Yn parhau i fod ar agor, trwy holiadur, 07:30, Dydd Sul 11 Awst 2024
-
The footpath on the bridge on both sides has steadily deteriorated for well over a year now. Not great for anyone with accessibility requirements or cycling. A real shame given that this is on National Cycle Network 756.
Postiwyd yn ddienw am 08:20, Dydd Sul 8 Medi 2024
Yn parhau i fod ar agor, trwy holiadur -
Yn parhau i fod ar agor, trwy holiadur, 20:12, Dydd Llun 7 Hydref 2024
Darparu diweddariad
Noder na chaiff diweddariadau eu hanfon at y cyngor. Bydd eich gwybodaeth ond yn cael ei defnyddio yn unol â’n polisi preifatrwydd