Gallwch symud o gwmpas gyda'ch bysellfwrdd
plws
minws
chwith
cywir
Gollwng pin ar y map i ddechrau adroddiad newydd
gofod
Gwasgwch 'Bylchu' eto er mwyn newid y lleoliad
gofod
Start new report here Reposition report here
Yn ôl at bob adroddiad

Damage to drainage ditches / verges following RTI 09.03.2020. Cones left out but no signage.

Adroddwyd yn y categori Roads/highways yn ddienw am 14:21, Maw 10 Mawrth 2020

Anfon at Hampshire County Council 6 munud yn hwyrach. Cyfeirnod FixMyStreet: 2052784.

RTI late Monday afternoon (9th March) HGV has damaged the drainage ditches both sides of the road as you exit the 30mph speed limit through Bramdean, travelling east. These ditches are an essential part of the drainage system through the village and were re-cut by Highways following the flooding through the village several years back. There is a high flow of water through the roadside gullies that form part of this essential sw system

Dim ond yr adroddwr gwreiddiol gall diweddaru. Os gwnaethoch chi'r adroddiad gwreiddiol , mewngofnodwch i ddiweddaru os gwelwch yn dda.