Gallwch symud o gwmpas gyda'ch bysellfwrdd
plws
minws
chwith
cywir
Gollwng pin ar y map i ddechrau adroddiad newydd
gofod
Gwasgwch 'Bylchu' eto er mwyn newid y lleoliad
gofod
Start new report here Reposition report here
Yn ôl at bob adroddiad

Road surface destroyed by construction traffic needs replacing

Adroddwyd drwy Android yn y categori Roads/highways yn ddienw am 19:01, Sul 8 Rhagfyr 2019

Anfon at Hampshire County Council 5 munud yn hwyrach. Cyfeirnod FixMyStreet: 1879668.

The road surface at the exit from Southleigh Road has been destroyed as a result of all of the construction traffic for the Bellway development. It is uneven and hazardous, especially to cycle and motorcycle traffic. It needs resurfacing as soon as possible.

Diweddariadau

  • Told by HCC that it doesn't need sorting. Clearly very low standards in their Engineers department.

    Postiwyd yn ddienw am 19:45, Sul 5 Ionawr 2020
    Yn parhau i fod ar agor, trwy holiadur

Dim ond yr adroddwr gwreiddiol gall diweddaru. Os gwnaethoch chi'r adroddiad gwreiddiol , mewngofnodwch i ddiweddaru os gwelwch yn dda.