Gallwch symud o gwmpas gyda'ch bysellfwrdd
plws
minws
chwith
cywir
Gollwng pin ar y map i ddechrau adroddiad newydd
gofod
Gwasgwch 'Bylchu' eto er mwyn newid y lleoliad
gofod
Start new report here Reposition report here
Yn ôl at bob adroddiad

Surface damage & subsidance + verge damage

Adroddwyd yn y categori Abandoned vehicles yn ddienw am 14:55, Llun 25 Tachwedd 2019

Anfon at Mid Suffolk District Council 5 munud yn hwyrach. Cyfeirnod FixMyStreet: 1861388.

This small side road, part of Golden Square, has a high central ridge caused by heavy vehicles making the edges subside. Previously caused by Refuse collection but recently damage is much worse because of work carried out moving many loads of earth in heavy trucks from a development at the top of the road. Damage seems to show that the road is merely a dirt track with a skim of tarmac. The central ridge is now so high that vehicles have eaten away the grass verge avoiding it. Much damage has also been cause to the corner verge outside Farriers and the small grass triangle where the road joins the B1116. The road was already had the ridge shaved off and patched with tarmac twice. What is required is for the whole road to be consolidated at the sides in order to bear the sort of loads imposed by the dust carts and other heavy vehicles. Also the corner outside Farriers and the grass triangle need to be protected with kerbs

Diweddariadau

  • Your reply was - "Not my responsibility - try Highways". Tried Highways website but problem was not accepted by their system. Will try again in the New Year.

    Postiwyd yn ddienw am 16:17, Llun 23 Rhagfyr 2019
    Yn parhau i fod ar agor, trwy holiadur

Darparu diweddariad

Noder na chaiff diweddariadau eu hanfon at y cyngor. Bydd eich gwybodaeth ond yn cael ei defnyddio yn unol â’n polisi preifatrwydd

Nesaf: Dwedwch wrthym ni amdanoch chi

Eich diweddariad

Dwedwch wrthym ni amdanoch chi

Oes gennych chi gyfrinair FixMyStreet?