Gallwch symud o gwmpas gyda'ch bysellfwrdd
plws
minws
chwith
cywir
Gollwng pin ar y map i ddechrau adroddiad newydd
gofod
Gwasgwch 'Bylchu' eto er mwyn newid y lleoliad
gofod
Start new report here Reposition report here
Yn ôl at bob adroddiad

Potholes for 1/2 mile after railway bridge

Adroddwyd yn y categori Potholes yn ddienw am 17:57, Iau 24 Ionawr 2019

Anfon at Hampshire County Council 3 munud yn hwyrach. Cyfeirnod FixMyStreet: 1522669.

The shoulder of the road on both sides is being eroded and has collapsed into potholes on a 1/2 mile stretch between the railway bridge and the entrance to test valley golf club. This has been an issue for over 12 months, I commute every weekday on this road. I have had wheel damage and blown tires as have many colleagues of mine that travel on this road.

Ffrwd RSS o ddiweddariadau i'r broblem hon Derbyn e-bost pan fydd diweddariadau i'r broblem hon.

Diweddariadau

  • 20/04/19 hit one of the many large potholes along this stretch and look at the damage to both my nearside wheels which resulted in flare tyres. I had to wait for recovery for 2 hours. The damage at the side of the road is not new but this time I was unable to avoid them as there were 2 cars on the other side of this already narrow stretch.

    Postiwyd yn ddienw am 08:03, Sul 21 Ebrill 2019

Dim ond yr adroddwr gwreiddiol gall diweddaru. Os gwnaethoch chi'r adroddiad gwreiddiol , mewngofnodwch i ddiweddaru os gwelwch yn dda.